Onshore Cable Route Maintenance

Drone Monitoring & Surveying Near Major Circuit

Drone Monitoring & Surveying Near Major Circuit

Onshore Route Surveys & Ecological Services for Offshore Wind Farm


We conducted physical route walks, mitigation area surveys, vegetation clearance, and ecology services for the onshore section of a UK offshore wind farm. 


Our survey teams ensured minimal ecological disruption while supporting infrastructure development.


  • Route Assessments – Identified optimal pathways.
  • Mitigation Studies – Developed environmental protection solutions.
  • Vegetation Clearance – Executed controlled clearances in compliance with conservation guidelines.
  • Ecology Support – Integrated biodiversity considerations into the project framework.
  • Liaised with all Landowners to ensure safe access was granted.


Outcome: Delivered all aspects within set timescales, balancing efficiency with environmental responsibility.


Testimonial:  

"JHS has provided a very reliable and extremely useful service to the OFTO. Highly recommended".


Ian Naylor, GYM OFTO Manager

Contact Us

Drone Monitoring & Surveying Near Major Circuit

Drone Monitoring & Surveying Near Major Circuit

Drone Monitoring & Surveying Near Major Circuit

We conducted drone surveys and site monitoring of a third party working near a major circuit, ensuring compliance and operational oversight. This included:


  • Site Visits & Landowner Liaison – Established clear communication and access coordination.
  • Pre-Work Drone Surveys – Captured baseline data before operations commenced.
  • Ongoing Monitoring – Conducted aerial inspections during works to track progress.
  • Post-Work Final Survey – Delivered comprehensive assessments for project closure.


Outcome: Ensured accurate reporting and seamless coordination between stakeholders.


Testimonial:

To come

Contact Us

12km Cable Route Link Pit Inspection

12km Cable Route Link Pit Inspection

12km Cable Route Link Pit Inspection

We partnered with the client to facilitate the inspection of link pits across a 12km cable route, ensuring safety, efficiency, and infrastructure maintenance.


Our Approach:
We arranged landowner permissions to secure access to all link pit locations, coordinating seamlessly with stakeholders to minimize disruption. As part of a dedicated team, we conducted site visits to every location, removed concrete covers safely, and ensured technicians had unobstructed access for their work.


Key Deliverables:

  • Landowner Liaison – Managed communication to ensure timely access.
  • Pit Cover Removal – Provided safe and secure access for maintenance.
  • Condition Assessment – Inspected and greased all pit frames and covers to maintain operational standards.
  • Team Collaboration – Worked closely with the client and technicians for efficient site operations.

Outcome:
The project was completed ahead of schedule, showcasing our commitment to timely execution and operational excellence.


Testimonial:

To come


Contact Us

Major Cable Repair & Site Support

12km Cable Route Link Pit Inspection

12km Cable Route Link Pit Inspection

We were tasked with facilitating a major cable repair project, providing comprehensive support and infrastructure to ensure efficient execution in challenging conditions.


Our Approach:
We coordinated closely with the client to manage all aspects of the repair, from logistical planning to on-site support. Our team ensured safe and effective operations while minimizing disruption for all stakeholders.


Key Deliverables:

  • Welfare Units & Machinery – Supplied essential equipment to support the project team.
  • Civils Work – Safely located and exposed the cable with precision excavation.
  • Access Coordination – Liaised with landowners to ensure seamless site access.
  • All-Weather Shelters – Provided durable shelters to enable work in adverse conditions.
  • Laydown Area & Site Office Setup – Prepared and equipped the site for operational efficiency.


Outcome:
The project was successfully completed on time, showcasing our ability to provide end-to-end solutions for large-scale infrastructure repairs while maintaining safety and reliability.


Testimonial:

To come

Contact Us

JHS

Mill Street, St. Asaph, Denbighshire LL17 0SP

0845 247 0234 / 07957 408417 / 07831 262832

Copyright © 2025 JHS - All Rights Reserved.

Powered by

Cookie Policy

This website uses cookies. By continuing to use this site, you accept our use of cookies. Privacy Policy

DeclineAccept & Close